Brookside Subdivision

  • cone icon
    Project Name
    Brookside Subdivision
  • digger icon
    Type of works provided
    Subdivision
  • pin icon
    Project location
    Featherston, Wairarapa
  • person icon
    Client
    Smalltime Developments
  • person icon
    Engineer
    Tomlinson & Carruthers Surveyors Ltd

The general scope of work was to install utility services to the proposed Brookfield subdivision.

Stage 1-2 of the works included providing 16 lots with new services, water, sewer, stormwater and power. A total of 9 sewer manholes were installed as part of stage 2 with over 200 meters of 150mm sewer pipeline connecting them. Ongoing works are currently under way for stage 3, with stage 4 and 5 awaiting council approval.

The scope also included; Construction of timber retaining walls, Construction of new shared walkways permeable concrete, grass crete, Construction of roading, kerbing, streetlights, tree pits, swales, Earthworks, cut to fill. Approx. 3000m3 and screening of fill to utilise top soils and rock rip rap.

Digger
Digger

Join the Team!

We are always looking for talented people to join the team here at Sierra Delta. Please use the provided contact form, or email us on admin@sdcl.co.nz to find out more.

  • Civil Tradespersons
  • Labourers
  • Class 4-5 Drivers
  • Drainlayers

Get a Free Quote